Running a Simulation - 3.1 English

UltraScale+ Devices Integrated 100G Ethernet Subsystem LogiCORE IP Product Guide (PG203)

Document ID
PG203
Release Date
2024-07-17
Version
3.1 English

For any project (100G Ethernet subsystem) generated out of context (OOC), the simulations can be run in the following ways:

  1. In the Sources Window, right-click the example project file (.xci), and select Open IP Example Design. The example project is created.
  2. In the Flow Navigator (left-hand pane) under Simulation, right-click Run Simulation and select Run Behavioral Simulation.
    Note: The post-synthesis and post-implementation simulation options are not supported for the 100G Ethernet subsystem.

    After the Run Behavioral Simulation Option is running, you can observe the compilation and elaboration phase through the activity in the Tcl Console, and in the Simulation tab of the Log Window.

  3. In Tcl Console, type the run all command and press Enter. This runs the complete simulation as per the test case provided in example design test bench.

    After the simulation is complete, the result can be viewed in the Tcl Console.