MSP430 Power Down Procedure

Zynq UltraScale plus MPSoC Power Management

Release Date
2023-04-24
  1. When the ZU+ powers down, the MSP430 also powers down the DRAM.
  2. When the ZU+ resets, the DRAM is also gets reset.
  1. Keeping DRAM powered up when ZU+ powers down.
  2. Force the DRAM reset signal to high so the DRAM will not reset.