Viewing the Run Status Display - 2021.2 English

Vivado Design Suite User Guide: Implementation (UG904)

Document ID
UG904
Release Date
2021-11-24
Version
2021.2 English

The status of a run that is in progress can be displayed in two ways for synthesis and implementation runs. These status displays show that a run is in progress. They allow you to cancel the run if desired.

  • You can find a run status indicator in the project status bar at the upper right corner of the Vivado® IDE, as shown in the following figure. The run status indicator displays a scrolling bar to indicate that the run is in process. You can click Cancel to end the run.

  • You can also find a run status indicator in the Design Runs window, as shown at the bottom left of the following figure. It displays a circular arrow (noted in red in the figure) to indicate that the run is in process. You can select the run and use the Reset Run command from the popup menu to cancel the run.