The following table shows the revision history for this document.
Section | Revision Summary |
---|---|
05/25/2022 Version 2022.1 | |
Power Distribution System | Updated Sysmon power supply (VCCAUX_SMON). |
PCB Design Considerations | Added XDC constraints description to step 7. |
I/O Planning Design Flows | Added GT and hard IP description. |
Types of Vivado Design Suite Projects for I/O Planning | Added GT and IP integrator recommendation note. |
Netlist-Based I/O Planning | Added GT block description. |
Gigabit Transceivers (GTs) | Added CPM5 guidance note. |
SSI Technology Considerations for I/O Planning | Added new section. |