You can get the real time resource utilization numbers in BD by enabling the option Resource Estimation from Project Settings as shown in the following figure.
Figure 1. Resource Estimation Option
The Summary section details the utilization per BD and the Hierarchy sections provides utilization per single IP inside the BD. The blocks that are excluded from the resource estimation are shown to the right.
Figure 2. BD Resource Estimation Summary