Set Bus Skew Section - 2025.2 English - UG906

Vivado Design Suite User Guide: Design Analysis and Closure Techniques (UG906)

Document ID
UG906
Release Date
2025-12-10
Version
2025.2 English

This section lists the detailed timing paths for each bus skew constraint. Each endpoint has an associated reference path that you can expand.

Vivado calculates the bus skew using the following formula:

Actual bus skew = endpoint relative delay − reference relative delay − relative CRPR
Figure 1. Example of Detail Path for the First Endpoint and its Reference Path

Use the following instructions to examine a path:

  1. Select the path in the report
  2. View the detailed timing path in the Properties pane
  3. Click the schematic icon or press F4 to generate the schematic for the endpoint path, the reference path, or both together