- Detailed gate-level floorplanning is time consuming.
- Detailed gate-level floorplanning requires extensive knowledge of the device and design.
- Detailed gate-level floorplanning might need to be redone if the netlist changes.
Recommended: Use
detailed gate-level floorplanning as a last resort.