Assigning Cells to RPM Sets - 2024.1 English

Vivado Design Suite User Guide: Using Constraints (UG903)

Document ID
UG903
Release Date
2024-06-15
Version
2024.1 English

Design elements in a hierarchical module that are assigned RLOC constraints are automatically grouped into an RPM set.

The grouping occurs by using an H_SET constraint that is implicitly defined by the combination of the design hierarchy and the RLOC constraint.

All design elements with RLOC constraints in a single block of the design hierarchy are considered to be in the same H_SET unless they are tagged with another set constraint, such as U_SET or HU_SET.