11-20-2025: Released with Vivado® Design Suite 2025.2 without changes from 2025.1.
| Section | Revision Summary |
|---|---|
| 05/29/2025 Version 2025.1 | |
| I/O and Clock Planning Design Flow Steps | Updated step #3. |
11-20-2025: Released with Vivado® Design Suite 2025.2 without changes from 2025.1.
| Section | Revision Summary |
|---|---|
| 05/29/2025 Version 2025.1 | |
| I/O and Clock Planning Design Flow Steps | Updated step #3. |