Example: Power-up Sequence - Example: Power-up Sequence - 1.15 English - UG585

Zynq 7000 SoC Technical Reference Manual (UG585)

Document_ID
UG585
Release_Date
2026-02-06
Version
1.15 English
  1. Power-up the PL. Refer to the data sheet for voltage sequencing requirements. The slcr.LVL_SHFTR_EN register should be equal to 0x0.
  2. Enable the PS-to-PL level shifters. Write 0x0A to the slcr.LVL_SHFTR_EN register.
  3. Program the PL.
  4. Wait for the PL to be programmed. Read devcfg.INT_STS [PCFG_DONE_INT] until = 1 to indicate that the DONE signals have asserted.
  5. Enable the PL-to-PS level shifters. Write 0x0F to the slcr.LVL_SHFTR_EN register.
  6. Begin to use the signals and interfaces between the PS and PL.