Any entity that is involved in power management is referred to as a node. The following sections describe how the platform management works with peripheral nodes allocated to each subsystem instead of the APU, RPU, and PL-MicroBlaze.
Generally, the APU, RPU, or PL-MicroBlaze inform the PMC about their usage of a peripheral node, by requesting for it. The PMC is then informed about the capability requirement needed from the peripheral node. At this point, the PMC powers up the peripheral node, so it can be initialized by the APU, RPU, or PL-MicroBlaze.