PS Power Down - UG1091

Kria SOM Carrier Card Design Guide (UG1091)

Document ID
UG1091
Release Date
2025-09-18
Revision
1.6 English
Figure 1. PS Power Down Sequence Diagram

  1. Carrier asserts PWROFF_C2M_L (t0). Power sequencers immediately begin rolling back all power solutions.
  2. Upon first power supply not meeting the required stabilization requirements, all status signals and request signaling from the SOM are deasserted (t1).
  3. At VCCOEN_PS_M2C (t2) deassertion carrier turn off power to VCCO supplies.
  4. Carrier remove SOM5V0 (t3)
    1. SOM5V0 does not have to be removed, however, the discharge of related power supplies and power up rules must be observed before PWROFF_C2M_L (t5) can be deasserted.
    2. (t4) is observed to be the same point as (t0) in the power-up sequence.
  5. Rails discharge for up to 2 seconds (t5).