Sequencing for Power-Up Events - Sequencing for Power-Up Events - 1.1 English - PG401

RFSoC DFE Non-Linear Filter LogiCORE IP Product Guide (PG401)

Document_ID
PG401
Release_Date
2026-06-23
Version
1.1 English
The following sequence of steps are mandatory for proper operation during power-up events.
  1. Assert aresetn and s_axi_ctrl_aresetn.
  2. Bring up aclk and s_axi_ctrl_aclk.
  3. Deassert s_axi_ctrl_aresetn and aresetn (0 to 1). To activate the control interface, deassert both the reset signals.
    Tip: This step brings system to the steady state.