Sequencing for Power-Down Events - Sequencing for Power-Down Events - 1.1 English - PG401

RFSoC DFE Non-Linear Filter LogiCORE IP Product Guide (PG401)

Document_ID
PG401
Release_Date
2026-06-23
Version
1.1 English
The following sequence of steps are mandatory for proper operation during power-down events.
  1. Assert aresetn.
  2. Bring down aclk.
  3. Assert s_axi_ctrl_aresetn when no AXI4-Lite control transaction is pending.
  4. Bring down s_axi_ctrl_aclk.
    Tip: This step brings system to the stand-by state.