General Checks - General Checks - 1.2 English - PG209

Interlaken 600G LogiCORE IP Product Guide (PG209)

Document ID
PG209
Release Date
2025-08-29
Version
1.2 English

Ensure that all the timing constraints for the core were properly incorporated from the example design and that all constraints were met during implementation.

  • Does it work in post-place and route timing simulation? If problems are seen in hardware but not in timing simulation, this could indicate a PCB issue. Ensure that all clock sources are active and clean.
  • If using MMCMs in the design, ensure that all MMCMs have obtained a lock by monitoring the LOCKED port.
  • If your outputs go to 0, check your licensing.