Power Sequencing - DS985

Kria K24 SOM Data Sheet (DS985)

Document ID
DS985
Release Date
2025-05-22
Revision
1.2 English

The carrier card power management circuit for your application must use the following sequence to power on the K24 SOM. Your carrier card supplies the +5V SOM power rail (VCC_SOM).

  1. When the VCC_SOM voltage level is within the specified range, the carrier card deasserts the POWER_OFF_C2M_L signal.
  2. The K24 SOM initiates onboard power sequencing.
  3. The K24 SOM asserts the VCCOEN_PS_M2C signal, indicating to the carrier card to turn on the supply rails for the PS peripheral devices.
  4. The K24 SOM asserts the VCCOEN_PL_M2C signal, indicating to the carrier card to turn on the supply rails for the PL peripheral devices as well as all VCCO rails for the HPIO and HDIO banks.