Design Advisory, Versal ACAP, XPE – VCC_FUSE recommendation change - This Design Advisory covers Versal Devices. For all Versal devices, VCC_FUSE should be powered up after the PMC domain is powered to prevent unintentional eFuse programming. To minimize single event latch-up (SEL), VCC_FUSE must be connected to GND if not programming eFUSE.

Release Date
2022-02-09