Reports - Reports - 2024.2 English - UG906

Vivado Design Suite User Guide: Design Analysis and Closure Techniques (UG906)

Document_ID
UG906
Release_Date
2024-12-19
Version
2024.2 English

This chapter discusses various report types:

  • General Reports covers various netlist-based reports as well as power and DRC.
  • Timing Reports covers all the reports that are related to timing constraints.
  • Timing Closure Reports covers reports that are used in the design closure phase. While these also contain timing and netlist-based analysis, there is a focus on how the two interact to cause timing closure challenges.