ML strategies are not generated by report_qor_suggestions if the required implementation flow in the
reference run has not been run. The ML Strategy
Availability table, shown in the following figure, checks off
each required implementation step.
Figure 1.
ML Strategy
Availability
The flow requirements are as follows:
- The
opt_designcommand must be run with the directiveExploreorDefault.Note: More than one call toopt_designis allowed, but the final call must meet this condition. - The remaining implementation directives must be either all set
to
Defaultor all set toExplore. Mix and match of these implementation steps is not permitted. - The
phys_opt_designcommand must be enabled - The design must be routed.