The report_qor_assessment
command can be
accessed on an open design in the Vivado IDE by
clicking .
Figure 1.
Report QoR
Assessment Dialog Box
The equivalent command at the Tcl console is as follows:
report_qor_assessment -name report_qor_assessment
To change the timing path limit from the default of 100, change the Number of paths for suggestion analysis shown in the
dialog box. The equivalent Tcl command uses the -max_paths
<N>
switch, where N is an integer:
report_qor_assessment -max_paths <N>
The Report passing metrics option
expands the details table to show all the metrics that were checked but passed. The
equivalent Tcl command uses the
-full_assessment_details
switch:report_qor_assessment -full_assessment_details
The option to generate supporting CSV files helps improve the ability to navigate a high volume of data when compared to the text report. To generate supporting CSV files, check the box and specify a directory. The CSV files are used to do the following:
- Show the timing paths contributing to the RQA score, and if suggestions are available to help address them
- Show cells and nets containing DONT_TOUCH properties that can prevent optimization
The equivalent Tcl command uses the -csv_output_dir
switch:
report_qor_assessment -csv_output_dir <directory>