Quality of Results Considerations - 2022.1 English

Vitis Unified Software Platform Documentation: Application Acceleration Development (UG1393)

Document ID
UG1393
Release Date
2022-05-25
Version
2022.1 English

The following recommendations help improve results for timing and area:

  • Pipeline all reset inputs and internally distribute resets avoiding high fanout nets.
  • Reset only essential control logic flip-flops.
  • Consider registering input and output signals to the extent possible.
  • Understand the size of the kernel relative to the capacity of the target platforms to ensure fit, especially if multiple kernels will be instantiated.
  • Recognize platforms that use stacked silicon interconnect (SSI) technology. These devices have multiple die and any logic that must cross between them should be flip-flop to flip-flop timing paths.