For accurate power analysis, make sure you have accurate timing
constraints, I/O constraints, and switching activity. The report_power
command indicates a confidence level, as shown in the
following figure. Target a High confidence level to ensure accurate power analysis. For
more information, see this link in the
Vivado
Design Suite User Guide: Power Analysis and Optimization
(UG907).
Figure 1. Power Analysis Confidence Level